Grain flow shall be verified in accordance with SAE/USCAR-8. This verification should be conducted at job setup, or whenever tooling or raw material changes are made that affect grain flow. The sample size and frequency should be identified in the manufacturer's Control Plan. All records, test specimens or photographs for this requirement shall conform to QS9000 record retention requirements.
请高手翻译这段英语,先谢谢了