|
发表于 2012-12-4 10:02:35
|
显示全部楼层
The main assembly line takes the form of automatic trolley line, with 14 workstations that 3.6 meters distanced from each other, the entire main line uses 15 automatic trolleys as carriers of the gear-box for assembly and logistics transportation between workstations. The power of the trolleys come from the signal and contact power between collectors on the trolleys and the track. The lifting mechanism of the trolley falls to the operation height when the torlley run to the assembly section, and run to the next section when the operation is done. The overturn mechanism of the trolley will turn as programmed when the press of the operation station needs to change the posture of the gear-box, to make the workpiece prepared. Outside the main line 2 unpowered tracks are set for part repacking. |
评分
-
查看全部评分
|